Project

Physical model tests port Blankenberge

Code
174E09113
Duration
15 October 2013 → 30 June 2014
Funding
Regional and community funding: various
Promotor
Research disciplines
  • Engineering and technology
    • Structural engineering
    • Other civil and building engineering
Keywords
haven Blankenberge
 
Project description

As part of the masterplan Coastal Safety is an ongoing study to design the storm walls around the harbor of Blankenberge. As part of this study, the wall heights to be determined as well as the emergent wave forces on the walls.