Project

Ecological monitoring OW plan Ostend: Seawall and Maritime accessibility to Ostend (T1 situation - first phase)

Code
174P0810
Duration
01 March 2010 → 31 December 2010
Funding
Regional and community funding: various
Promotor
Research disciplines
  • Engineering and technology
    • Construction engineering
    • Earthquake engineering
    • Geotechnical and environmental engineering
    • Water engineering
    • Wind engineering
Keywords
maritime accessibility
 
Project description

General invitation to tender for services: Ecological monitoring OW plan Ostend seawall and maritime access to Ostend (t1 situation-phase). The object of the contract is two-fold: 1) the taking of samples and laboratory research relating to the biological t1-situation of soft substrates, in the coastal zone to Ostend (and, as well as processing, analysis, interpretation and presentation of analysis results; 2) The providing expert advice, to formulate research proposals and support in the preparation of EIA reports the contract is following tasks: 1. Measurement campaign soft substrates * sampling of beach and foreshore samples; * Organic laboratory examination of the samples (macrobenthos-research); * Physico-chemical laboratory analysis of the samples; 2. The processing, analysis, interpretation and reporting of the test results, including the coupling of the physico-chemical data to the biological. The previously collected data HINTS T0 ecological monitoring is integrated into the reporting. 3. Provision of expert advice based on their own expertise and the current investigation.