Project

Circular Transition of Offshore Wind Mills Materials

Code
DOCT/009136
Duration
09 May 2022 → 26 September 2027 (Ongoing)
Doctoral researcher
Research disciplines
  • Natural sciences
    • Environmental impact and risk assessment
  • Engineering and technology
    • Materials recycling and valorisation
Keywords
offshore wind energy decommissioning end-of-life circular economy material flow analysis life cycle assessment
 
Project description

The ICON project CTO (Circular Transition of Offshore Windmill Materials) prepares the Flemish offshore wind industry for the end-of-life phase of the first North Sea wind farms. Parkwind coordinates the consortium with Witteveen+Bos, Galloo, Ghent University and the University of Antwerp, with financial support from VLAIO through the Blue Cluster and SIM spearhead clusters. The project maps the components of an offshore wind farm and the available end-of-life processes, and builds decommissioning scenarios with alternative designs, materials and offshore operations. These scenarios are evaluated in a life cycle sustainability assessment that covers environmental, economic and social impacts. The STEN research group at Ghent University develops an integrated assessment that combines material flow analysis, circular economy metrics and life cycle assessment, and applies it to a Belgian offshore wind farm. The approach traces each material from the installed farm to its end-of-life destination and rates the quality of that destination, from recycling to material left in situ. The results identify environmental hotspots and end-of-life bottlenecks across the main components of the farm. These insights support the shift from retrospective to prospective assessment and inform design, material and decommissioning choices for future offshore wind farms.